NOTICE
To all MEMBER-CONSUMER OWNERS please be informed of the posted LOCAL/NGCP power service interruption.
SCHEDULED POWER INTERRUPTIONS
Date/Time | Areas Affected | Purpose |
---|---|---|
May 30, 2025 START 9:00 AM END 6:00 PM FRIDAY | Wanti to Agbannawag, Lepanto and Rizal. Whole Municipality of Rizal, Agbannawag, Nambaran, Lacnog East, Lacnog West, Ipil, Malalao, Lepanto, Bulo, Mapaoay. | Replacement of rotten pole at Mapaoay. Installation of midspan along lines towards Rizal. Right-of Way Clearing. |
May 9, 2025 START 1:00 PM END 5:00 PM FRIDAY | Dagupan-Laya boundary towards Laya East and Laya West, Balong, Magaogao, Cabaruan, Sucbot, San Julian | Emergency interruption for midspan for the correction of clearance of 3-phase lines infront Bobson Hardware. Right-of-Way clearing. |
May 8, 2025 START 9:00AM END 12:00NN THURSDAY | Kumho towards Nambucayan and some parts of Upper Bado Dangwa | Emergency interruption for the correction of low clearance lines at Nambucayan-Bado Dangwa boundary. Right-of-Way clearing of coconut tree near the primary line. |
May 6, 2025 START 9:00AM END 6:00PM TUESDAY | Bulo near new bridge | Emergency midspanning due to low clearance of primary line |
April 5, 2025 START 9:00 AM END 1:00 PM SATURDAY | Taclobao Gas Station towards Purok 7 Bacras-some parts of Bacras, Kasabaan and some parts of Bulanao Norte near Baligatan Bridge | ROW clearing-Replacement of damaged insulators-Retightening of jumpers-Fixing of pole for tapping near Malabong Hardware |
April 10, 2025 START 9:00 AM END 6:00 PM THURSDAY | Dalimuno to Upper Kalinga- Bagumbayan, Balawag, Magnao, Guilayon, Lucog, Malin-awa, Naneng, Suyang, Dupag, Amlao, Municipalities of Pasil-Balbalan-Lubuagan-Tinglayan. | Continuation of massive 3-phase backbone line Right-of-Way clearing. Retightening of connections. Mid pole installation. This is in preparstion for the upcoming 2025 Elections. |
April 9, 2025 START 9:00 AM END 6:00 PM WEDNESDAY | Barracks to Dagupan. Bulanao Centro(some parts of Purok 5 and Purok 1), San Juan, Appas, Balong, Cabaruan, Casigayan, Dagupan Centro, Dagupan West, Dilag, Laya East, Laya West, Magsaysay, San Julian, Magaogao, Sucbot, Guinatan | Massive 3-phase backbone line Right-of-Way clearing. Retightening of connections. This is in preparation for the upcoming 2025 Elections. |
April 8, 2025 START 9:00 AM END 6:00 PM TUESDAY | Capitol to Bulanao Area. Brgy Bulanao Centro(excluding some parts of Purok 5 and Purok 1), Bulanao Norte, some parts of Bacras Purok 7 and San Juan (Sunrise). | Massive 3-phase backbone line Right-of-Way clearing. Retightening of connections. This is in preparation for the upcoming 2025 Elections. |
April 4, 2025 START 9:00 AM END 6:00 PM FRIDAY | Callagdao to Rizal-Agbannawag-Lepanto, Quezon. Some parts of Callagdao, some parts of Bacras, Wanti, Agbannawag, Ipil, Lacnog East, Lacnog West, Malalao, Nambaran, Municipality of Rizal. | Massive 3-phase backbone line Right-of-Way clearing. Retightening of connections. Mid pole installation. This is in preparation for the upcoming 2025 Elections. |
April 3, 2025 START 9:00 AM END 6:00 PM THURSDAY | Callagdao to Magabbangon to Paracelis and towards Tanudan. Cudal, Calaccad, Anggacan, Anggacan Sur, Babbanoy, Dacalan, Dupligan, Ga-ang, Lay-asan, Lower Lubo, Lower Mangali, Lower Taloctoc, Mabaca, Mangali Centro, Pangol, Poblacion, Upper Lubo, Upper Taloctoc. | Massive backbone line Right-of-Way clearing. Retightening of connections. This is in preparation for the upcoming 2025 Elections. |
April 2, 2025 START 9:00 AM END 6:00 PM WEDNESDAY | Some parts of Calanan, Bado Dangwa, Bagumbayan, Balawag, Bantay, Lucog, Magnao, Malin-awa, Nambucayan, Naneng, Suyang, Dupag, Guilayon, Amlao, Municipalities of Pasil-Balbalan-Lubuagan-Tinglayan. | Massive 3-phase backbone line Right-of-Way clearing. Retightening of connections. Mid pole installation. This is in preparation for the upcoming 2025 Elections. |
April 1, 2025 START 9:00 AM END 6:00 PM TUESDAY | Some parts Calanan towards Pinukpuk and Apayao. Brgys. New Tanglag, Masablang, Tuga, Gobgob, Lanna, Cabaritan, Municipality of Pinukpuk, some parts of Apayao (Municipality of Conner) | Massive 3-phase backbone line Right-of-Way clearing. Retightening of connections. Mid pole installation. This is in preparation for the upcoming 2025 Elections. |
March 16, 2025 START 9:00 AM END 6:00 PM SATURDAY | San Juan, Appas, Balong, Dilag, Cabaruan, Magsaysay, Casigayan, Laya East, Laya West, San Julian, Magaogao, Dagupan West, Dagupan Centro | Pole relocation at Magsaysay infront Magsaysay Elementary School-Right-of Way Clearing |
March 7, 2025 START 9:00 AM END 5:00 PM FRIDAY | Areas around Xentro Mall inside Bulanao Public Market-Bulanao Centro Barangay Hall-Areas near Bulanao Centro Market Police Station | Pole and line removal for the completion of roofing of the Tabuk Public Market Xentro Mall and transfer of service drops of consumers |
March 03, 2025 START AROUND 4:30 PM TO 5:00 PM END 8:00 PM MONDAY | Appas-Balong-Cabaruan-Casigayan-Dagupan Centro-Dagupan West-Dilag-Laya East-Laya West-Magsaysay-San Juan-San Julian-Magaogao (around 30 mins interruption)-------------Areas around City Hall( around 3 hours interruption) | Emergency interruption to replace damaged distribution transformer infront City Hall- and line sectioning in the area |
March 05, 2025 START 6:00 AM END 6:00 PM WEDNESDAY | ALL KAELCO COVERGAE | 1. NGCP to conduct electrical testing and general maintenance of high voltage power equipment.at Tuguegarao substation. 2. NGCP to conduct corrective maintenance work along Tuguegarao-Solana-Tabuk 69KV T/L. |
February 28, 2025 START 9:00 AM END 5:00 PM FRIDAY | Maledda | Pole relocation due to road widening and concreting at Maledda Area. ROW clearing. |
February 27, 2025 START 9:00 AM END 5:00 PM THURSDAY | Some parts of Calanan towards Pinukpuk-New Tanglag, Masablang, Tuga, Gobgob, Lanna, Cabaritan, Municipalities of Pinukpuk and some parts of Apayao-Conner. | Pole relocation due to road widening and canal construction at Calanan Area. Upgrading of poles and midspan. ROW clearing. |
February 26, 2025 START 1:00 PM END 5:00 PM WEDNESDAY | Patacalig-Taluctoc-Mangali-Bannagao-Lubo-Gaang-Dacalan | Power interruption to accomodate the request of Tanudan LGU for the cutting of tree close to the lines at Patacalig, Tanudan/ Right-of-Way clearing |
February 25, 2025 START 9:00 AM END 5:00 PM TUESDAY | Back of EJB Builder's Supply Appas Tabuk | Pole relocation and Right-of-Way clearing |
February 22, 2025 START 9:00 AM END 5:00 PM SATURDAY | Celis' Store towards DEMPHS-LTO-DOST-CARAA Grounds and nearby areas-Purok 6 Bulanao-Florendo Village | Pole relocation due to road widening along irrigation canal near Sport's Complex and DEPED Office. Right-of-Way clearing. |
February 21, 2025 START 9:00 AM END 5:00 PM FRIDAY | All Feeder 2 Coverage-KSU, NIA, COA, DOLE, COMELEC, DILG, TESDA, BJMP and nearby areas of Purok 6, Bulanao-some parts of FF Cruz, Talama, Calanan, Bado Dangwa, Bagumbayan, Balawag, Bantay, Lucog, Magnao, Malin-awa, Nambucayan, Naneng, Suyang, Dupag, Guilayon, Amlao, Municipalities of Pasil-Balbalan-Lubuagan-Tinglayan, New Tanglag, Masablang, Tuga, Gobgob, Lanna, Cabaritan, Municipalities of Pinukpuk and some parts of Apayao-Conner. | Pole relocation due to road widening and canal construction at Calanan Area. Upgrading of poles and midspan. ROW clearing. |
November 8, 2023 START 8:30 AM END 5:00 PM WEDNESDAY | Whole of Conner, Apayao | Line Upgrading from 2 Phase to 3 Phase and Line ROW Clearing |
October 27, 2023 START 9:00 AM END 5:00 PM FRIDAY | Sitio Kilayon, Ligayan, Bulo, Nawoy, Balantoy, Balbalan. Poblacion, | To replace damaged pole at cadamayan, Poblacion, Balbalan (c4 Construction |
October 21, 2023 START 8:30 AM END 5:00 PM FRIDAY | Barangay Naneng, Dupag, Municipality of Pasil, Lubuagan, Tinglayan and Balbalan | Rescheduled from October 20, 2023 Relocation of Pole due to Road Widening, Execute Massive ROW Clearing |
October 19, 2023 START 8:30 AM END 5:00 PM THURSDAY | Sitio Kulilimtao and Barangay Karagawan, Apayao | ROW Clearing and Replacement of Broken Insulators |
October 18, 2023 START 8:30 AM END 5:00 PM WEDNESDAY | Whole of Conner, Apayao | Line Upgrading from 2 Phase to 3 Phase and Line ROW Clearing |
October 11, 2023 START 9:00 AM END 5:00 PM WEDNESDAY | -TANUBONG, SAN GORIO,MATUKNANG AND MANSANITA | -RIGHT OF WAY CLEARING |
October 12, 2023 START 8:30 AM END 5:00 PM THURSDAY | -CABARITAN TOWARDS DUGPA/BAYAO, PINUKPUK | -RIGHT OF WAY CLEARING |
October 13, 2023 START 8:30 AM END 5:00 PM FRIDAY | -PUROK 2 BULANAO INTERSECTION OF LAMMAWIN & SILAO ST., VILORIA ST., BAAC ST., AND ANCHETA ST. | -REPLACEMENT OF ROTTEN POLE -RIGHT OF WAY CLEARING |
October 14 , 2023 START 8:30 AM END 12:00 PM SATURDAY | -BULANAO BOLIVAR TOWARDS BACKRAS -ST. WILLIAMS TO DAVIDSON -PUROK 2,3,DATU AND SOME PARTS OF SUNRISE | -RIGHT OF WAY CLEARING -INSTALLATION OF MIDSPAN AND TAPPING OF CHOWKING |
October 14 , 2023 START 1:00PM END 5:30 PM SATURDAY | TAMPCO MAIN OFFICE APPAS TOWARDS SHELL -BABALAN SHOP,NASGUEBAN,GEN. LUNA ST., SOME PARTS OF BALAGTAS ST., INCLUDING ST. PETER CLAVER HOSPITAL -SOME PART OF MAYANGAO ST. -ST. THOMAS CHURCH AND SOME PARTS OF UMANGIL ST. -UBBOG MAGSAYSAY, SOME PARTS OF OROQUITA ST., ARELLANO ST., AND BONIFACIO ST. -INCLUDES PNB, BAYLE, PANDAYAN, MERCURY,KALINGA HARDWARE AND LBC | -INSTALLATION OF MIDSPAN OF TAMPCO MAIN OFFICE INFRONT MAGSAYSAY CLINIC -REMOVAL OF ROTTEN POLE |
October 12 , 2023 START 8:00AM END 6:00 PM THURSDAY | Kabugao, Apayao | To facilitate corrective maintenance of the following; 1) 400kVA power transformer 2) 300 kW Generator set and its associated equipment and protective relays |
October 11 , 2023 START 8:30AM END 5:00 PM WEDNESDAY | Whole of Conner, Apayao | Line 3 Phase Upgrading and ROW Clearing |
October 10 , 2023 START 8:30AM END 5:00 PM TUESDAY | EKB toward Paco, Kabugao, Apayao | ROW Clearing and replacement of broken insulators |
October 10 , 2023 START 8:30AM END 5:00 PM TUESDAY | Han-han, Conner, Apayao | ROW Clearing and replacement of broken insulators |
October 9 , 2023 START 8:30AM END 5:00 PM MONDAY | Buluan, Conner, Apayao | ROW Clearing and replacement of broken insulators |
September 29, 2023 START 9:00AM END 5:00 PM FRIDAY | Some parts of Purok 6 Hilltop (back of DOST), Some parts of Demphs, Bulanao East | Relocation of Pole, Clustering |
September 28, 2023 START 9:00AM END 5:00 PM THURSDAY | Purok Talna, Dilag | Right of Way Clearing, Replacement of two rotten poles |
September 26, 2023 START 9:00AM END 5:00 PM TUESDAY | Sucbot towards Ginatan, Magaogao, Pinukpuk | Right of Way Clearing, Replacement of two rotten poles, Clustering |
September 7, 2023 START 8:30AM END 12:00 NOON THURSDAY | Purok 6 Hilltop towards Demphs, Dep-Ed, Florendo, LTO, PENRO and Civil Service Commission, some parts of LKDEO | Right of Way Clearing, Installation of Intermediate Pole at Bulanao East Elementary School (DepEd) & in front of PENRO, Relocation of Service Drop Wires & Meter of PENRO |
September 2, 2023 START 8:30AM END 5:00PM SATURDAY | Bado Dangwa towards Nambucayan and Guilayon | To facilitate the construction of the tapping of Bado Dangwa Elementary School and to conduct ROW Clearing. |
August 30, 2023 START 7:00AM END 5:00PM WEDNESDAY | Whole of KAELCO Coverage | (NGCP Activity)To implement corrective maintenance works along Tuguegarao-Solana-Tabuk 69kV Line. |
July 21, 2023 START 8:00AM END 5:00PM FRIDAY | Bagumbayan towards Upper Kalinga (Tinglayan, Pasil and Balbalan) | To accomodate BMJ Builders request to cut a big acacia tree for road improvement that might fall along the lines |
July 20, 2023 START 8:00AM END 5:00PM THURSDAY | All Coverage of Dagupan Cabaruan, Laya, Dilag, San Julian, Balong, Sucbot | 1. Feeder 1 Upgrade to Triple Circuit from KAELCO Substation to Capitol 2. Remove Pole at San Julian due to canal concreting 3. ROW Clearing and other Line Maintenance |
July 13, 2023 START 8:30AM END 5:00PM THURSDAY | Purok 6, Bulanao (From Girl's Scout of the Philippines Building towards Circle and Civil Service Commissions Building | Pay-out lines for the preparation of triple circuit |
July 8, 2023 START 8:30AM END 5:00PM SATURDAY | Barangay Cabaruan, Sucbot and Magaogao | Relocation of Pole and ROW Clearing |
June 20-21, 2023 START 8:00AM END 5:00PM TUESDAY & WEDNESDAY | Barangay Dugpa and Bayao, Pinukpuk, Rizal, Kalinga | Relocation of pole due to Road Widening and Concreting, Conduct ROW Clearing |
June 3, 2023 START 9:00AM END 5:00PM SATURDAY | Saudi, Bulo | Relocation of pole. |
June 2, 2023 START 9:00AM END 5:00PM FRIDAY | De Jesus Street Along Purok 5, Bulanao, Tabuk City and near by residences. | Relocation of pole. |
June 1, 2023 START 7:00AM END 6:00PM THURSDAY | Whole of Kalinga | 1. To Implement reconductoring along Tuguegarao-Solana 69kV Line Segment. 2. To implement preventive and corrective maintenance works at Tuguegarao-Tabuk 69kV Line (NGCP ACTIVITY) |
May 13, 2023 START 9:00AM END 5:00PM SATURDAY | Sunrise only, San Juan, Bulanao, Tabuk City | Local Interruption, Relocatiopn of Pole due to Road Widening |
May 6, 2023 START 7:00AM END 6:00PM SATURDAY | Whole of Kalinga | 1. To Implement reconductoring along Tuguegarao-Solana 69kV Line Segment. 2. To implement wood pole replacement and corrective maintenance works along Tuguegarao-Tabuk 69kV Line. 3. To implement preventive and corrective maintenance works at Tuguegarao Substation. (NGCP ACTIVITY) Reschedule from May 3, 2023 to May 6, 2023. |
APRIL 1, 2023 START 6:00AM END 5:30PM THURSDAY | Whole of Kalinga | 1. To Implement reconductoring along Tuguegarao-Solana 69kV Line Segment. 2. To implement wood pole replacement and corrective maintenance works along Tuguegarao-Tabuk 69kV Line. (NGCP ACTIVITY) |
January 28, 2023 START 6:00AM END 6:00PM SATURDAY | Whole of Kalinga | 1. To Implement reconductoring along Tuguegarao-Solana 69kV Line Segment. 2. To implement wood pole replacement and corrective maintenance works along Tuguegarao-Tabuk 69kV Line. (NGCP ACTIVITY) |
January 7, 2023 START 6:00AM END 6:00PM SATURDAY | Whole of Kalinga | 1. To Implement reconductoring along Tuguegarao-Solana 69kV Line Segment. 2. To corrective maintenance works along Tuguegarao-Tabuk 69kV Line. (NGCP ACTIVITY) |
January 4, 2023 START 9:00AM END 5:00PM WEDNESDAY | Purok 2, 3, 4 and some parts of Purok 5 and Purok 6, Bulanao, Purok DATO | To facilitate the tapping pole and energization of Children Wards and Welness Center Bulanao Tabuk City, Load Centering and Right of Way Clearing, Line Reconductoring. |
December 11, 2022 START 6:00AM END 6:00PM SUNDAY | Whole of Kalinga | Original schedule on December 9, 2022 1. To Implement reconductoring along Tuguegarao-Solana 69kV Line Segment. 2. To Implement replacement of wood poles to steel poles and corrective maintenance works along Tuguegarao-Tabuk 69kV Line. Re-scheduled to December 11, 2022 to accommodate request of CAGELCO I due to their scheduled Annual General Membership Assembly (AGMA). |
December 3, 2022 START 9:00AM END 5:00PM SATURDAY | Banneng towards Pangol, Tanudan | Right of Way Clearing |
November 26, 2022 START 6:00AM END 6:00PM SATURDAY | Whole of Kalinga | 1. To Implement reconductoring along Tuguegarao-Solana 69kV Line Segment. 2. To Implement replacement of wood poles to steel poles and corrective maintenance works along Tuguegarao-Tabuk 69kV Line. (NGCP ACTIVITY) |
November 18, 2022 START 8:30AM END 5:00PM FRIDAY | Liwan, Conner | ROW clearing and replacement of broken insulators |
November 17, 2022 START 8:30AM END 5:00PM THURSDAY | Caglayan, Conner | ROW clearing and replacement of broken insulators |
November 16, 2022 START 8:30AM END 5:00PM WEDNESDAY | Talifugo, Conner | ROW clearing and replacement of broken insulators |
November 15, 2022 START 8:30AM END 5:00PM TUESDAY | Masico, Conner | ROW clearing and replacement of rotten cross arm |
November 14, 2022 START 8:30AM END 5:00PM MONDAY | Conner Town Proper | ROW clearing and replacement of broken insulators |
November 12, 2022 START 8:30AM END 5:30PM SATURDAY | Sucbot, Magaogao & Guinatan | Right of way clearing |
November 10 & 11, 2022 START 8:30AM END 5:00PM THURSDAY & FRIDAY | Along National Road, In front of KPH to FF Cruz | Reconductoring and Load Centering |
November 11, 2022 START 9:00AM END 5:00PM FRIDAY | Bicok, Culong, Malalinta, San Luis and Pinococ | Relocation of pole due to construction of bridge |
November 9, 2022 START 9:00AM END 5:00PM WEDNESDAY | Lepanto, Isabela | Replacement of rotten pole and row clearing |
November 4, 2022 START 6:00AM END 6:00PM FRIDAY | Whole of Kalinga | NGCP Scheduled Power Interruption, To implement reconductoring along Tuguegarao-Solana 69kV Line Segment, To implement replacement of wood poles to steel poles and corrective maintenance works along Tuguegarao-Tabuk 69kV Line |
October 24, 2022 START 9:00AM END 5:00PM MONDAY | Calanan towards balay ti umili (Along National Road) | Reconductoring and Right of Way Clearing |
October 25, 2022 START 9:00AM END 5:00PM TUESDAY | Purok 1 and Purok 7 of Gobgob (along National Road) | Reconductoring and Right of Way Clearing |
October 26, 2022 START 9:00AM END 5:00PM WEDNESDAY | Bakras Bayle towards Namnama Bakras (Along National Road | Reconductoring and Right of Way Clearing |
October 27, 2022 START 9:00AM END 5:00PM THURSDAY | Purok 1 and Purok 4 of Agbannawag | Reconductoring and Right of Way Clearing |
October 28, 2022 START 9:00AM END 5:00PM FRIDAY | Old Florendo, Bulanao, Tabuk City | Reconstruction of A1 to A15 assembly due to house construction, Reconductoring and upgrading of line and right of way clearing |